amjad khan
About the Candidate
Dear Sir,
I have acquired experience in the energy field as an engineer & as a manager. I have performed the roles of commissioning team leader with the operation & project management.
I had worked in the Electrical maintenance of electrical depts. In the site I have worked in the tank farm area, gas conditioning skid for gas turbines, water treatment plant for boiler .serving the team of utilities in managements in Coal-HP/Ash-HP/bauxite handling from train unloading to barge loading as operations and electrical maintenance.
Here, I’m applying for a suitable position which is, of course very close to my ability to work and calibers. I am enumerating my tenure and familiarity with the working environment for your consideration as my candidature.
Work Experience:
Job Position: Senior Manager: Electrical
Job: Commissioning Team / Erection Coordination. ( Contract Job/ International -EPC )
Company: Shapoorji Pallonji EPC, Pune.India;
Location: Site – Kamsar, Guinea.
Country: Guinea.
Time: 08/2018 To 01/2020
This was the new overseas responsibility for my career. I was working for the team in “the turnover and commissioning for the shipping port development site in “GAC/ Guinea”. Over my experience, I have been awarded the holding in the electrical and instrumentation commissioning controls responsibility for the team. GAC project is of bauxite shipping port development .involved of bauxite handling from mine over rail transportation to Kamsar shipping port.
Responsibilities:
l Leading the company automation & instrumentation scope in the plant for site erection.
l Professional site HT/LT – electrical authorized operation person for LOTO/PTW/HSE team member.( issuer /receiver /verifications /area managers/site team issuer for excavations PTWs.
l Drafting and finalizing the SOP/ITP/SMP/BOM/check sheets for all automation and electrical packages of site.
l Heading team member of plant Commissioning completion team for the Electrical & automation packages.
l Management’s team updating the scheduling of the project for the “planning team & construction team”.
l Providing the training of the CCR and site automation training to the client/ O&M team/ in line with commissioning activities.
l Over the site responsibilities as below other than management positions.
o Central control room erection and commissioning with all engineering units.
o Coordinating all SCADA/Profibus/Modbus/Ethernet lively operational with automation systems of site.
o Completing the “ISAT” of “project fiber optic backbone in coordination with SCADA/PLC/ fire systems” at the site.
o Coordination of engineering and client GAC over the automation and CCR operations with FO backbone and utility packages.
o Leading the Commissioning of UPS/VSD’s/MCC/PMCC/Cranes/BMS/motor-HT & LT/Siemens PLC/ Fibre optic backbone completion with RIO panels networking’s /battery chargers/switchgears’ LT&HT/automation packages.
o Project documentation and protocols compilation with Fluor PMC (MC plus+. Compilation) for responsible electrical and all automation packages on daily basis.
o Workforce management of the subcontractors and invoicing for logistic teams.
o Multitasking as an individual for erection supervision /engineering co-coordinator site.
o Performing the PSSR/walk-downs/HSE audits/ lay down areas-logistics machinery audits.
o Project site PTW coordinator and supervisor for HSE/PPE compliance s. Site LOTO coordination with shift operations and commissioning team.
Job Position: Manager: Electrical
Job: Commissioning Team/ Project Site Coordination.
Company: Essar Power Mp Limited –ESSAR.
Location: Waidhan.
Country: India
Time: 04/2011 To 01/2018
it’s a utility’s plant of ESSAR STEEL, having the capacity of 1200MW {Coal-Fired /Greenfield / (2×600 MW Units/HARBIN Supplied).
Responsibilities:
l As a Manager in team electrical maintenance and projects commissioning coordinator with higher management.
o On-Sites Spare Management for erection /commissioning/and operational consumables. (QA/QC/HSE/PPEs/LOTOS.)
o Contract management for ARC/AMC/ professional service
o Workforce Deputation’s in the electrical site.
o Data compilation for Master plant BOM from OEM documents and field survey for VED/ABC criteria.
o Attending routine management meetings and walk-downs for HSE/ O&M/shut-down/start-up/emergency team squad.
o Project site coordinator for security, Team admin, and safety team as an electrical team leader
l SAP implementation in shift routines and physical movements. (PM/MM)
As an individual electrical manager in the O&M team responsibility for Plant installations, commissioning, with their PM, and breakdown maintenance with OEM
o EOT/winch drives/Tower cranes:
o UPS /Battery Chargers/FCBC/stabilizers site commissioning assistance.
o Managing PLC of Siemens.
o VSD- LT/CT/ hoisting drives of EOT.
o The plant installed air conditioners and refrigeration installation with the AMC team.
o Plant motor maintenance from HT/LT/DC with AMC/ARC.
o Commissioning of the HT/LT-switchboards / PMCC/MCC.
o Transformers with maintenance & commissioning.
o Switchyard operation and commissioning coordination with the team. (400 KV)
o I was contributing the site modification/retrofitting jobs with technical supervision.
o Local Vendor developments for plant O&M needful.
Job Position: Deputy Manager
Job: Operation: Commissioning Team/ Erection Coordination.
Company: Vadinar Power Company Limited -ESSAR-Gujarat
Location: Jamnagar.
Country: India.
Time: 08/2008 To 03/2011
Responsibilities: it’s an ESSAR refinery CPP expansion project-CPP – 220 MW co-gen plant/325 MW steam load.
l Leading for Commissioning of two frames 9E gas turbine (124 MW each) as experienced
l I worked in boiler commissioning inline to refinery steam header HP/MP/LP.
l Commissioning and Operation of the Project. (Gas turbine frame -9E /dual fuel+Thermax supplement firing HRSG compatible / MW).
o I performed as a Lead member of the commissioning team at the project site(PMC /erection group)
o Generating MIS report.
o Organizing the P.S.S.R/walk-downs/HSE audits. {pre start safety review}
o DCC follow up and updating
o Project site material receipt compilation.
o We are ensuring quality and safety survey report.
o All drives start and commissioning process, documenting with site report generation.
o Format system enforcement in Mechanical Completion for all commissioning initiations.
o As-built records compilation in line to DCC.
l I was managing Shift Operations of Team at the project site control room.
o Load coordination with CPP & refinery control room.
o Process loading /unloading of steam in coordination with refinery expansion & roll-up.
o Coordination for MIS/HSE/FIRE/operations at the site.PTW/LOTO’s
o Switchyard operations 220 KV.
*I have demonstrated the track record of working safely, contributed to achieving time scale and with no lost time injury, no manual errors as an operational team member. As an appreciation, I was transferred to a new project, EPMPL -1200MW coal-fired Greenfield site.
Job Position: Assistant Manager: Operations
Job: Operation And Commissioning Team (Field And Desk Operator)
Company: Bhander Power Plant – ESSAR-Gujarat
Location: Surat
Country: India
Time: 01/2005 To 08/2008
Responsibilities: it is a CPP of 3 Gas turbine 124 MW frame 9E/GE make & 2 steam turbines of Siemens (55MW&135MW), coupled to 3 HRSG (fired /unfired).
l Shift operation -startup-shutdown/emergency handling /load management
l Load coordination.
l Routine plants PTW/loto clearance and field isolations.
l Field supervisor for plant operations for PLT of naphtha/LDO
l Operation of water processing in plant
o DM water plant operation.
o First, fill for boiler light-up.
o Monitoring cooling towers & handling with ETP & chemical treatments.
l PTW compliance with PPE with isolations verifications.
l Operational inductions for the recruits at the site.
l CMS & Operation of utilities like a pump, compressor, fans, And Fuel tanks, etc.
l MIS and Power Generation Report.
l MTP and maintenance planning updates in CMMS.
l Energy Management and Conservation measure and site application
l Preparation of documents for Integrated Management System
l I am maintaining the project site –Motorola- radio/wireless services
*As appreciation management selected me for the new project of refinery CPP expansion of Vadinar power comp ltd.
Professional skills:
· Power Plant Operations as a field engineer and desk controller (7 years)
· Electrical and plant operational Troubleshooting ∙(8 years )
· Material Management (7 years)
· Project Management. (7 years)
· Production Management. (3 years)
· Compliance Management.
· Good knowledge of automobiles. ∙(2 years)
· Total Quality Management. (7 years)
Technical skills:
*Qualified as a unit operator in Simulator Operation -210MW / STG: NPTI. Nagpur.
*Qualified as a unit operator in Simulator Operation – 325 MW/ COMBINED CYCLE POWER PLANT {{gas-based}: NTPC kawas, Surat, Gujarat, India.
*Boiler operation certified class-2 up to 100 tons/hr.
Personal details:
Highest Degree: B.S: Power Engineering
Skype: kamjad913.
DOB: 27/04/1981
Nationality: Indian
Religion: Muslim
Mobile : +917440776110
E-mail: kamjad913@gmail.com
LinkedIn : https://www.linkedin.com/in/amjad-khan-5a6064104/
Expected salary: competently
Date to join: immediately.
Notice period: no notices.
License driving: LMV
Authorized To Work: India
Address:
Plot no: C-181, Koyla Vihar
Landmark: Near New RTO Office.
Street: Seepat-Ntpc Road.
Area: Lagra, mopka
City: Bilaspur
Pin code: 495006
State: Chhattisgarh
India.
Academic details:
§ Course: Bachelor of Science
§ Stream: Power Engineering.
§ Grade: 5.3, 60%.
§ year: 2011
§ University: Birla institute of technology and science.
§ Place: Pilani. Rajasthan
§ Country: India
§ Course: Post Diploma certification
§ Stream: Thermal Power Plant Engineering -210 MW/coal-fired.
§ Grade: 75%.
§ year: 2004
§ University: National Power Training Institute.
§ place: Nagpur, Maharashtra
§ Country: India
§ Course: Diploma in Engineering
§ Stream: Electrical Engineering
§ Grade: 71%.
§ year: 2001
§ University: Rajiv Gandhi prodyogiki Vishwavidyalaya.Bhopal
§ place: Ambikapur
§ Country: India
Education
completed
awarded
awarded
Experience
Job Position: Senior Manager: Electrical
Job: Commissioning Team / Erection Coordination. ( Contract Job/ International -EPC )
Company: Shapoorji Pallonji EPC, Pune.India;
Location: Site – Kamsar, Guinea.
Country: Guinea.
Time: 08/2018 To 01/2020
This was the new overseas responsibility for my career. I was working for the team in “the turnover and commissioning for the shipping port development site in “GAC/ Guinea”. Over my experience, I have been awarded the holding in the electrical and instrumentation commissioning controls responsibility for the team. GAC project is of bauxite shipping port development .involved of bauxite handling from mine over rail transportation to Kamsar shipping port.
Responsibilities:
Leading the company automation & instrumentation scope in the plant for site erection.
Professional site HT/LT – electrical authorized operation person for LOTO/PTW/HSE team member.( issuer /receiver /verifications /area managers/site team issuer for excavations PTWs.
Drafting and finalizing the SOP/ITP/SMP/BOM/check sheets for all automation and electrical packages of site.
Heading team member of plant Commissioning completion team for the Electrical & automation packages.
Management’s team updating the scheduling of the project for the “planning team & constructions team”.
Providing the training of the CCR and site automation training to the client/ O&M team/ in line with commissioning activities.
Over the site responsibilities as below other than management positions.
o Central control room erection and commissioning with all engineering units.
o Coordinating all SCADA/Profibus/Modbus/Ethernet lively operational with automation systems of site.
o Completing the “ISAT” of “project fiber optic backbone in coordination with SCADA/PLC/ fire systems” at the site.
o Coordination of engineering and client GAC over the automation and CCR operations with FO backbone and utility packages.
o Leading the Commissioning of UPS/VSD’s/MCC/PMCC/Cranes/BMS/motor-HT & LT/Siemens PLC/ Fibre optic backbone completion with RIO panels networking’s /battery chargers/switchgears’ LT&HT/automation packages.
o Project documentation and protocols compilation with Fluor PMC (MC plus+. Compilation) for responsible electrical and all automation packages on daily basis.
o Workforce management of the subcontractors and invoicing for logistic teams.
o Multitasking as an individual for erection supervision /engineering co-coordinator site.
o Performing the PSSR/walk-downs/HSE audits/ lay down areas-logistics machinery audits.
o Project site PTW coordinator and supervisor for HSE/PPE compliance s. Site LOTO coordination with shift operations and commissioning team.
Job Position: Manager: Electrical
Job: Commissioning Team/ Project Site Coordination.
Company: Essar Power Mp Limited –ESSAR.
Location: Waidhan.
Country: India
Time: 04/2011 To 01/2018
it’s a utility’s plant of ESSAR STEEL, having the capacity of 1200MW {Coal-Fired /Greenfield / (2×600 MW Units/HARBIN Supplied).
Responsibilities:
As a Manager in team electrical maintenance and projects commissioning coordinator with higher management.
o On-Sites Spare Management for erection /commissioning/and operational consumables. (QA/QC/HSE/PPEs/LOTOS.)
o Contract management for ARC/AMC/ professional service.
o Workforce Deputation’s in the electrical site.
o Data compilation for Master plant BOM from OEM documents and field survey for VED/ABC criteria.
o Attending routine managements meetings and walk-downs for HSE/ O&M/shut-down/start-up/emergency team squad.
o Project site coordinator for security, Team admin, and safety team as an electrical team leader
SAP implementation in shift routines and physical movements. (PM/MM)
As an individual electrical manager in the O&M team responsibility for Plant installations, commissioning, with their PM and breakdown maintenance with OEM
o EOT/winch drives/Tower cranes:
o UPS /Battery Chargers/FCBC/stabilizers site commissioning assistance.
o Managing PLC of Siemens.
o VSD- LT/CT/ hoisting drives of EOT.
o The plant installed air conditioners and refrigeration installation with the AMC team.
o Plant motor maintenance from HT/LT/DC with AMC/ARC.
o Commissioning of the HT/LT-switchboards / PMCC/MCC.
o Transformers with maintenance & commissioning.
o Switchyard operation and commissioning coordination with the team. (400 KV)
o I was contributing the site modification/retrofitting jobs with technical supervision.
o Local Vendor developments for plant O&M needful.
Job Position: Deputy Manager
Job: Operation: Commissioning Team/ Erection Coordination.
Company: Vadinar Power Company Limited -ESSAR-Gujarat
Location: Jamnagar.
Country: India.
Time: 08/2008 To 03/2011
Responsibilities: it’s an ESSAR refinery CPP expansion project-CPP – 220 MW co-gen plant/325 MW steam load.
Leading for Commissioning of two frames 9E gas turbine (124 MW each) as experienced
I worked in boiler commissioning inline to refinery steam header HP/MP/LP.
Commissioning and Operation of the Project. (Gas turbine frame -9E /dual fuel+Thermax supplement firing HRSG compatible / MW).
o I performed as a Lead member of the commissioning team at the project site(PMC /erection group)
o Generating MIS report.
o Organizing the P.S.S.R/walk-downs/HSE audits. {pre start safety review}
o DCC follow up and updating to Project site material receipt compilation.
o We are ensuring quality and safety survey report.
o All drives start and commissioning process, documenting with site report generation.
o Format system enforcement in Mechanical Completion for all commissioning initiations.
o As-built records compilation in line to DCC.
I was managing Shift Operations of the Team at the project site control room.
o Load coordination with CPP & refinery control room.
o Process loading /unloading of steam in coordination with refinery expansion & roll-up.
o Coordination for MIS/HSE/FIRE/operations at the site.PTW/LOTO’s
o Switchyard operations 220 KV.
*I have demonstrated the track record of working safely, contributed to achieving time scale and with no lost time injury, no manual errors as an operational team member. As an appreciation, I was transferred to a new project, EPMPL -1200MW coal-fired Greenfield site.
Job Position: Assistant Manager: Operations
Job: Operation And Commissioning Team (Field And Desk Operator)
Company: Bhander Power Plant – ESSAR-Gujarat
Location: Surat
Country: India
Time: 01/2005 To 08/2008
Responsibilities: it is a CPP of 3 Gas turbine 124 MW frame 9E/GE make & 2 steam turbines of Siemens (55MW&135MW), coupled to 3 HRSG (fired /unfired).
Shift operation -startup-shutdown/emergency handling /load management
Load coordination.
Routine plants PTW/loto clearance and field isolations.
Field supervisor for plant operations for PLT of naphtha/LDO
Operation of water processing in plant
o DM water plant operation.
o First, fill for boiler light-up.
o Monitoring cooling towers & handling with ETP & chemical treatments.
PTW compliance with PPE with isolations verifications.
Operational inductions for the recruits at the site.
CMS & Operation of utilities like a pump, compressor, fans, And Fuel tanks, etc.
MIS and Power Generation Report.
MTP and maintenance planning updates in CMMS.
Energy Management and Conservation measure and site application
Preparation of documents for Integrated Management System
I am maintaining the project site –Motorola- radio/wireless services
*As appreciation management selected me for the new project of refinery CPP expansion of Vadinar power comp ltd.